Gateway to Think Tanks
来源类型 | FEEM working papers "Note di lavoro" series |
规范类型 | 论文 |
Investing in Photovoltaics: Timing, Plant Sizing and Smart Grids Flexibility | |
Marina Bertolini; Chiara D'Alpaos; Michele Moretto | |
发表日期 | 2016 |
出处 | Mitigation, Innovation and Transformation Pathways |
出版年 | 2016 |
语种 | 英语 |
摘要 | In Italy and in many EU countries, the last decade was characterized by a large development of distributed generation power plants. Their presence determined new critical issues for the design and management of the overall energy system and the electric grid due to the presence of discontinuous production sources. It is commonly agreed that contingent problems that affect local grids (e.g. inefficiency, congestion rents, power outages, etc.) may be solved by the implementation of a “smarter” electric grid. The main feature of smarts grid is the great increase in production and consumption flexibility. Smart grids give producers and consumers, the opportunity to be active in the market and strategically decide their optimal production/consumption scheme. The paper provides a theoretical framework to model the prosumer’s decision to invest in a photovoltaic power plant, assuming it is integrated in a smart grid. To capture the value of managerial flexibility, a real option approach is implemented. We calibrate and test the model by using data from the Italian energy market. *** Suggested citation: Bertolini, M., C. D’Alpaos, M. Moretto, (2016), 'Investing in Photovoltaics: Timing, Plant Sizing and Smart Grids Flexibility', Nota di Lavoro 60.2016, Milan, Italy: Fondazione Eni Enrico Mattei |
特色分类 | Q42;C61;D81 |
关键词 | Smart Grids Renewable Energy Sources Real Options Prosumer |
URL | https://www.feem.it/en/publications/feem-working-papers-note-di-lavoro-series/investing-in-photovoltaics-timing-plant-sizing-and-smart-grids-flexibility/ |
来源智库 | Fondazione Eni Enrico Mattei (Italy) |
资源类型 | 智库出版物 |
条目标识符 | http://119.78.100.153/handle/2XGU8XDN/118514 |
推荐引用方式 GB/T 7714 | Marina Bertolini,Chiara D'Alpaos,Michele Moretto. Investing in Photovoltaics: Timing, Plant Sizing and Smart Grids Flexibility. 2016. |
条目包含的文件 | ||||||
文件名称/大小 | 资源类型 | 版本类型 | 开放类型 | 使用许可 | ||
2016921056381Nota_di(71KB) | 智库出版物 | 限制开放 | CC BY-NC-SA | 浏览 | ||
201692105774NDL2016-(1327KB) | 智库出版物 | 限制开放 | CC BY-NC-SA | 浏览 |
除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。